To prepare for an SB 721 balcony inspection in Los Angeles, gather your building records, list the balconies and other elevated structures, and confirm how the inspector can reach each one. If a balcony can only be reached through a tenant’s apartment, confirm whether the inspector needs that unit before sending an entry notice.
This checklist is for apartment owners and property managers in the City of Los Angeles. Copy it into a work order or share it with the person meeting the inspector.
Los Angeles Balcony Inspection Checklist
| What to Prepare | What to Do Before the Visit |
|---|---|
| Property address and jurisdiction | Confirm which building department serves the property address. |
| Building records | Gather the latest signed inspection report, available plans, relevant permits, and repair records. |
| List of elevated structures | Label each balcony, deck, exterior stairway, and walkway by building, floor, or unit. |
| Access routes | Note which structures are reached through occupied units, locked gates, or common areas. Ask whether the inspector needs access from below. |
| Tenant coordination | Confirm which units require entry, arrange any required notices, and tell affected residents what to clear. |
| On-site contact | Assign someone who can meet the inspector, open common areas, and handle changes to the access plan. |
Which Los Angeles Apartment Buildings Need an SB 721 Inspection?
In Los Angeles, an apartment building generally needs an SB 721 inspection if it has three or more dwelling units and at least one qualifying exterior elevated element (EEE). Whether a balcony, deck, exterior stairway, or walkway qualifies depends on how it was built and how it’s used.
Under California Health and Safety Code § 17973, a structure qualifies when it meets all four conditions:
It extends beyond the building’s exterior walls.
It is designed for people to use.
Its walking surface is more than six feet above ground level.
It relies wholly or substantially on wood or wood-based products for structural support or stability. www.dre.ca.gov
How do you check which local agency to contact?
Look up the property by address or parcel number using Los Angeles City Planning’s ZIMAS tool. If the property is within the City of Los Angeles, refer to LADBS Information Bulletin P/BC 2026-144 for local guidance. For properties elsewhere in Los Angeles County or Southern California, confirm which agency serves the address. For example, Long Beach publishes its own balcony hazard reporting instructions.
What Does an SB 721 Inspector Check?
An SB 721 inspector evaluates the load-bearing components and associated waterproofing of qualifying structures. Depending on how a balcony or walkway is built, the inspector may need to see the underside, look at the connection to the exterior wall, or assess components hidden behind a finish. Flag enclosed undersides or other access limitations when you schedule the visit.
If the balcony has a concrete-looking surface or a stucco underside, share any drawings that show how it’s supported. The finish can conceal wood framing. Plans and repair records can help the inspector determine whether the structure qualifies and how to evaluate it.
What Records Should You Gather Before the Visit?
Gather your latest signed inspection report, available building plans, relevant permits, and dated repair photos. Label each photo with the building, unit, or structure ID so the inspector can match it to the right location. If an older report uses different labels, add a note matching them to your current list. For example, “rear upper balcony” might now be listed as “Building A, Unit 203.”
Include maintenance observations that help the inspector locate a concern. If a resident reported staining beneath a walkway after heavy rain, record where it appeared and when you first noticed it. If plans are missing, share a simple property sketch and check the LADBS property records search for available permits or certificates of occupancy.
How Do You Plan Balcony Access Before Notifying Tenants?
List how the inspector can reach each balcony, stairway, and walkway. Share the list with the inspector to confirm which occupied units require entry, then use it to plan tenant notices and arrange keys for locked common areas.
Example Access List for a Two-Building Property
| Area | Access Route | What the Property Manager Checks |
|---|---|---|
| Building A, Unit 203 balcony | Through Unit 203 | Confirm whether entry is needed and record when notice is delivered. |
| Building A, rear stair landing | Through a locked rear gate | Confirm who has the gate key and will be on-site. |
| Building B, second-floor walkway | Up the courtyard stairs | Ask whether the inspector also needs access beneath the walkway. |
California law requires an inspection sample of at least 15% of each type of qualifying exterior elevated element. Give the inspector a list of all known structures so they can determine which ones to evaluate and flag any additional access needs.
How Do You Coordinate Tenant Entry on Inspection Day?
Give affected residents the expected entry window, the purpose of the visit, and the name of the person they can contact about scheduling. When entry into an occupied dwelling is required, California Civil Code § 1954 generally calls for reasonable advance written notice that includes the date, approximate time, and purpose of entry. Keep a record of how and when each notice was delivered.
Tell residents what the inspector’s instructions require. A tenant may only need to move items away from a specific wall or railing. If an area is unavailable on the day, record the location and agree with the inspector on what can be completed and whether a return visit is needed.
How Great Escape Inspections Helps Los Angeles Apartment Owners
Great Escape Inspections offers a free in-person estimate for qualifying Los Angeles apartment properties. We use the visit to review the property and help define the scope of your SB 721 balcony and deck inspection. During scheduling, we discuss access to occupied units and common areas. After the inspection, we document the findings in a written report.
When you request an inspection, share the property address, the number of units in each building, and any known access restrictions. If you’ve already made an access list, have it ready when you speak with us.
Frequently Asked Questions
How long does an SB 721 balcony inspection take?
The time on-site depends on the number and types of structures, the building layout, and how easily the inspector can reach them. Ask your inspector for an estimated visit window when scheduling.
Can an SB 721 balcony inspection go ahead in the rain?
Yes, if the inspector can safely reach and evaluate the structures. Confirm the plan with your inspector before changing the appointment or tenant notices.
Can I schedule SB 721 inspections for multiple Los Angeles properties together?
Ask your inspection provider to coordinate the visits. Share each property address, unit count, and known access restrictions so the provider can assess whether the visits can fit into one day.
Can an SB 721 inspection happen while exterior work is underway?
It may be possible if the inspector can safely reach and evaluate the required areas. Tell the inspector about scaffolding, tarps, or active work before the visit so they can confirm what they can inspect.